Beginning in June 2015, Tate Lab of Physics was offline for a full interior renovation through summer 2017. All existing spaces were removed and reconfigured, and new space was added along the Church Street side of the building.
More information about the classroom changes is available at www.z.umn.edu/tatereno
General project info is available at https://cppm.umn.edu/john-t-tate-hall