Ruttan B45 Ceiling and Seating Replacement

Student view from the back of Ruttan B45's showing old seating and ceiling facing
Instructor view from the front of Ruttan B45's showing old seating and ceiling
Student view from the back of the classroom in Ruttan B45 showing the updated ceiling and seating.
View from the front of the classroom in Ruttan B45 showing the updated ceiling and seating.

Project description

Ruttan B45 was renovated over Summer 2024. Student seating was failing and replacement parts were no longer available. The replacement seating is similar bench table and attached chairs.  As a part of this project, the ceiling was also replaced with more even distribution of lighting and HVAC fixtures.