Project description
Ruttan B45 was renovated over Summer 2024. Student seating was failing and replacement parts were no longer available. The replacement seating is similar bench table and attached chairs. As a part of this project, the ceiling was also replaced with more even distribution of lighting and HVAC fixtures.